Martinus is in a unique position within the rail industry with an extensive range of critical plant and equipment for track construction. Our plant team have in-house logistics and maintenance capabilities that allows us to retain full control of all aspects of logistics and maintenance.
LOCOMOTIVES
• Quantity – 8
• DC Class
• 1600Hp
BALLAST WAGONS
• Quantity – 40
• Gauge convertible
• Remote operation of ballast delivery
• 100T capacity per wagon
OLE manitou boom
• Quantity - 2 EWP
• Tri-Gauge
• OLE Maintenance and Construction
VAIA CAR - TLPS 2500
- This model has already been converted for use on narrow gauge railways and is in excellent operational condition.
WAGONS AND GANTRIES
- Gauge convertible
- Quantity – 42
- 26 configured as sleeper wagons to support track layering machine
- 16 configured as rail delivery train
FLASH BUTT WELDERS
- Quantity – 5EO Paton Containerised Units
- Ability to conduct destress welding
- High production, high quality welding on track or in a yard environment
HIGH PRODUCTION SLEEPER LAYING MACHINE
- 32T Cat Excavator
- Built in 2013
- Production rates of up to 3 kilometres per day
OLE PLATFORM-CONSIST
- Quantity - 2 - Zephir LOK 4.90 locomotive
- Quantity - 1 - Hercules
- Narrow gauge
FLASH BUTT WELDING YARDS
AGITATOR
• Quantity – 1
• Narrow gauge
PLASSER SMD-80G TRACK LAYING AND REHABILITATION MACHINE
- Continuous motion track construction and rehabilitation machine accompanied by 2 gantry cranes and 26 sleeper wagons
- Gauge convertible between narrow and standard gauge
- Production rates of up to 300m per hour
RESURFACING PLANT
• Quantity – 4 Tampers and 4 Regulators
• Narrow and Standard gauge
• Mainline and Switch and Crossing tampers
HI-RAIL BUCKET TRUCK WITH PANTOGRAPH
• Quantity-1 HR Bucket Truck with Pantograph Attachment
• Tri-gauge
• OLE maintenance and construction
CONTINUOUS TRACK LIFTER x 2
• Quantity – 2
• Gauge Convertible
• High production rates whist achieving bulk track
lifts up to 150mm
TRIPP MACHINE
• Removal and Insertion of all types of sleepers
• Automated high production sleeper removal and
insertion
• Production rates of up to 900 sleepers per hour